The Hook: Bastar’s “Surplus” Water and Tamil Nadu’s Thirst

Connect

The Indravati carries a large monsoon flow out of Bastar, and Chhattisgarh irrigates only a small part of the plateau. On paper, the Godavari–Cauvery link plans to carry “unutilised” water from the Indravati sub-basin, collected at a proposed barrage at Inchampalli on the Godavari, south through the Krishna and Pennar basins to the Kaveri delta. Chhattisgarh asks: unutilised today, or unneeded forever?

What is the river inter-linking programme, how far has it reached, and why is it so contested?

Why it matters: Prelims asks the NPP year, NWDA, the number of links, the first project under implementation (Ken-Betwa) and the rivers and states involved. Mains GS-III asks for a balanced evaluation, and the Chhattisgarh angle (Indravati, Mahanadi) is the kind of point that lifts an answer.


India’s water is unevenly spread in space (Brahmaputra and Mahanadi basins have surplus; western and southern Peninsula, Bundelkhand and Rajasthan are short) and in time (most rain falls in about four monsoon months). Inter-basin water transfer (अंतर-बेसिन जल अंतरण) moves water through dams, canals and tunnels from surplus to deficit basins.

Timeline

timeline
    title River inter-linking in India
    1972 : K.L. Rao proposes a Ganga-Cauvery link
    1977 : Dinshaw Dastur proposes the Garland Canal
    1980 : National Perspective Plan (Ministry of Irrigation and CWC)
    1982 : National Water Development Agency (NWDA) set up
    2002 : Task force on inter-linking after a Supreme Court direction
    2012 : Supreme Court directs the Centre to implement the programme
    2021 : Union Cabinet approves the Ken-Betwa link
    2024 : PKC-ERCP MoU (January) and Ken-Betwa foundation stone (25 December)

The National Perspective Plan (NPP, 1980)

FactDetail
Prepared byThen Ministry of Irrigation (now Ministry of Jal Shakti) and the Central Water Commission, August 1980
Implementing bodyNational Water Development Agency (NWDA), set up in 1982
Links identified30: 16 Peninsular + 14 Himalayan
Status (as of July 2025)Pre-feasibility reports for all 30; feasibility reports for 26; detailed project reports for 11
Under implementationKen-Betwa is the only NPP link under implementation (as of 2025)

Two components

Himalayan componentPeninsular component
IdeaStore monsoon flows of the Ganga and Brahmaputra tributaries (many in Nepal and Bhutan) and transfer surplus westward and southwardTransfer surplus from the Mahanadi and Godavari southward to the Krishna, Pennar and Kaveri; also smaller links in the west and centre
ExamplesManas–Sankosh–Teesta–Ganga; Kosi–Mechi; Ghaghra–Yamuna; Sarda–YamunaMahanadi (Manibhadra)–Godavari (Dowlaiswaram); Godavari–Krishna; Krishna–Pennar; Pennar–Kaveri; Ken–Betwa; Parbati–Kalisindh–Chambal; Par–Tapi–Narmada; Damanganga–Pinjal
DifficultyNeeds agreements with Nepal and Bhutan; seismic, high mountainsInter-state consent, submergence of forests and tribal lands

Key Projects

FactDetail
RiversKen and Betwa, both right-bank tributaries of the Yamuna
StatesMadhya Pradesh and Uttar Pradesh: the drought-prone Bundelkhand region
Main structureDaudhan dam on the Ken, with a link canal to the Betwa
ApprovalUnion Cabinet, December 2021
Cost and funding₹44,605 crore; 90% Centre, 10% States
Foundation stone25 December 2024 at Khajuraho, by the Prime Minister
Planned benefitsIrrigation in Bundelkhand; drinking water for about 44 lakh people in MP and 21 lakh in UP; 103 MW hydropower and 27 MW solar (official figures)
ConcernsSubmergence of part of the Panna Tiger Reserve; tree felling; effects on vultures and the downstream Ken Gharial Sanctuary; questions over whether the Ken really has surplus water

Modified Parbati–Kalisindh–Chambal–ERCP

  • Merges the NPP’s Parbati–Kalisindh–Chambal link with Rajasthan’s Eastern Rajasthan Canal Project (ERCP).
  • States: Rajasthan and Madhya Pradesh. MoU signed 28 January 2024; foundation stone and a tripartite agreement in December 2024.
  • Aim: drinking water and irrigation in eastern Rajasthan and the Chambal region of MP.
  • Proposed by NWDA as Godavari (Inchampalli)–Krishna–Pennar–Cauvery (Grand Anicut).
  • It would divert about 148 TMC of water described as the unutilised share of Chhattisgarh in the Indravati sub-basin.
  • Chhattisgarh has objected that this water is earmarked for its own future irrigation and hydropower projects in Bastar. Andhra Pradesh and others have raised their own objections over shares. Consensus among the riparian states had not been reached as of 2025–26.
  • Planned to carry Mahanadi surplus from Manibhadra (Odisha) to the Godavari at Dowlaiswaram (Andhra Pradesh).
  • Odisha disputes that the Mahanadi has surplus water, the same argument it makes against Chhattisgarh’s upstream barrages before the Mahanadi Water Disputes Tribunal (2018).
Chhattisgarh is central to the Peninsular plan
The Peninsular component depends on two “surplus” basins, the Mahanadi and the Godavari, and Chhattisgarh is upstream on both (the Mahanadi rises at Sihawa; the Indravati drains Bastar). Any national link plan therefore needs Chhattisgarh’s consent and must account for its own irrigation needs. See Drainage of Chhattisgarh.

Evaluation for Mains

Arguments forArguments against
Moves monsoon surplus to drought-prone areas (Bundelkhand, Rayalaseema, Rajasthan)“Surplus” is disputed; upstream states plan to use the water themselves
Expands irrigation and drinking-water supplyVery high cost and long gestation; earlier projects have faced overruns
Flood moderation in the Ganga–Brahmaputra plainsSubmergence of forests, tiger reserves and tribal villages; displacement
Hydropower and inland navigationReduced flow to deltas: salinity, sediment loss, threat to mangroves and fisheries
Can reduce over-pumping of groundwaterEcological flow, seismic risk, and international agreements needed for the Himalayan component
Cheaper alternatives exist: watershed works, tanks, drip irrigation, crop diversification

Balanced line for answers: inter-linking can help where surplus and deficit are clear and consent exists, but it must be project-by-project, with environmental flows, rehabilitation and state consent, alongside demand-side measures.


Inter-State River Water Disputes

ProvisionDetail
Article 262Parliament may by law provide for adjudication of inter-state river disputes and may exclude the jurisdiction of the Supreme Court and other courts
Seventh ScheduleWater is a State subject (Entry 17, State List), subject to Entry 56, Union List (regulation of inter-state rivers by Parliament)
LawsInter-State River Water Disputes Act, 1956 (tribunals); River Boards Act, 1956

Major water disputes tribunals (year constituted)

TribunalYearStates
Krishna (first)1969Maharashtra, Karnataka, Andhra Pradesh
Godavari1969Maharashtra, Karnataka, AP, MP, Odisha
Narmada1969Gujarat, MP, Maharashtra, Rajasthan
Ravi–Beas1986Punjab, Haryana, Rajasthan
Cauvery1990Karnataka, Tamil Nadu, Kerala, Puducherry
Krishna (second)2004Maharashtra, Karnataka, AP (Telangana later)
Vansadhara2010Odisha, Andhra Pradesh
Mahadayi (Mandovi)2010Goa, Karnataka, Maharashtra
Mahanadi2018Odisha, Chhattisgarh

Cauvery: the tribunal’s final award came in 2007; the Supreme Court modified it in February 2018 and the Cauvery Water Management Authority was set up in 2018 to implement it.


Memory Tricks

'80-82, 30 = 16 + 14'
NPP 1980, NWDA 1982. 30 links = 16 Peninsular + 14 Himalayan: the Peninsula, with more states and more disputes, has the larger number.
Ken-Betwa in one line
“Daudhan dam, Panna concern, Bundelkhand benefit, Khajuraho foundation, 25 December 2024.”

Don’t Confuse

ThisvsThat
NPP: 1980 (plan)NWDA: 1982 (agency)
Ken–Betwa: MP–UP, Yamuna tributariesPKC–ERCP: Rajasthan–MP, Chambal system
Godavari–Cauvery: Indravati water from Chhattisgarh’s shareMahanadi–Godavari: Manibhadra (Odisha) to Dowlaiswaram (AP)
Article 262: water disputesArticle 263: Inter-State Council
Mahanadi tribunal: Odisha vs Chhattisgarh (2018)Mahadayi tribunal: Goa vs Karnataka (2010)

Common Mistakes

Trap 1: many links are already flowing
As of 2025, only Ken–Betwa among the 30 NPP links was under implementation. Many others are at the feasibility or DPR stage.
Trap 2: the Supreme Court has jurisdiction over water tribunals' disputes in the first instance
Under Article 262 and the 1956 Act, original jurisdiction over a dispute referred to a tribunal is excluded. The Supreme Court has still heard appeals against tribunal awards through Article 136, as in the Cauvery case (2018), so do not write that courts have no role at all.
Trap 3: water is a Union subject
Water is a State subject (Entry 17), subject to Parliament’s power over inter-state rivers (Entry 56, Union List).

Practice

All questions below are original practice questions written in CGPSC style. They are not previous-year questions.

Level 1: Foundation

  1. The National Perspective Plan for water resources development was prepared in ________.
  2. The NWDA has identified ________ links: ________ Peninsular and ________ Himalayan.
  3. The Daudhan dam of the Ken–Betwa link is on the ________ river.
Answers
  1. 1980 (August)
  2. 30; 16; 14
  3. Ken

Level 2: Prelims MCQs

Q1. Consider the following statements about the Ken–Betwa Link Project:

  1. Both the Ken and the Betwa are tributaries of the Yamuna.
  2. The project is meant mainly for the Bundelkhand region of Madhya Pradesh and Uttar Pradesh.
  3. The project is funded equally by the Centre and the States.

Which of the statements given above is/are correct?

  • (a) 1 only
  • (b) 2 and 3 only
  • (c) 1 and 2 only
  • (d) 1, 2 and 3
Answer and explanation
(c) 1 and 2 only. Both rivers are right-bank tributaries of the Yamuna, and the project targets Bundelkhand in MP and UP. Funding is 90:10 (Centre:States), not equal.

Q2. Match List-I (Link project) with List-II (States mainly involved):

List-IList-II
A. Ken–Betwa1. Rajasthan and Madhya Pradesh
B. Parbati–Kalisindh–Chambal–ERCP2. Odisha and Andhra Pradesh
C. Mahanadi (Manibhadra)–Godavari (Dowlaiswaram)3. Madhya Pradesh and Uttar Pradesh
D. Damanganga–Pinjal4. Maharashtra (Mumbai water supply), with Gujarat
  • (a) A-3, B-2, C-1, D-4
  • (b) A-1, B-3, C-2, D-4
  • (c) A-3, B-1, C-4, D-2
  • (d) A-3, B-1, C-2, D-4
Answer and explanation
(d) A-3, B-1, C-2, D-4. Ken–Betwa: MP and UP. PKC–ERCP: Rajasthan and MP. Mahanadi–Godavari: from Manibhadra in Odisha to Dowlaiswaram in Andhra Pradesh. Damanganga–Pinjal: mainly for Mumbai’s water supply, with the Damanganga shared with Gujarat.

Q3. Which Article of the Constitution allows Parliament to exclude the jurisdiction of the Supreme Court in inter-state river water disputes?

  • (a) Article 131
  • (b) Article 262
  • (c) Article 263
  • (d) Article 246
Answer and explanation
(b) Article 262. Article 131 is the Supreme Court’s original jurisdiction in Centre–State and inter-state disputes, which Article 262 law can exclude for water. Article 263 is about the Inter-State Council; Article 246 distributes legislative subjects.

Q4. The Godavari–Cauvery link proposal plans to divert water from which sub-basin, a matter of concern for Chhattisgarh?

  • (a) Wainganga
  • (b) Manjra
  • (c) Indravati
  • (d) Sabari
Answer and explanation
(c) Indravati. NWDA describes the water as the unutilised share of Chhattisgarh in the Indravati sub-basin, to be collected at Inchampalli on the Godavari. Chhattisgarh says it needs this water for its own projects in Bastar.

Q5. The Mahanadi Water Disputes Tribunal, constituted in 2018, deals with a dispute between:

  • (a) Chhattisgarh and Odisha
  • (b) Odisha and Andhra Pradesh
  • (c) Chhattisgarh and Madhya Pradesh
  • (d) Odisha and Jharkhand
Answer and explanation
(a) Chhattisgarh and Odisha. Odisha objected to Chhattisgarh’s upstream barrages on the Mahanadi, saying they reduce lean-season flows into Hirakud.

Level 3: Mains Answer Writing

Q1. What is the National Perspective Plan for inter-linking of rivers? (60 words)

Model answer outline
  • Prepared in 1980 by the Ministry of Irrigation and the CWC to transfer water from surplus to deficit basins.
  • NWDA (1982) identified 30 links: 16 Peninsular, 14 Himalayan.
  • Status (2025): feasibility reports for 26, DPRs for 11; Ken–Betwa is the first under implementation (foundation stone December 2024).
  • Aim: irrigation, drinking water, flood moderation and hydropower.

Q2. “River inter-linking is a solution to India’s water problems, but not a free one.” Critically examine, with reference to Chhattisgarh. (150–200 words)

Model answer outline
  • Intro: Uneven distribution of water in space and time; NPP (1980) and NWDA’s 30 links aim to move monsoon surplus to deficit regions.
  • Benefits: irrigation and drinking water in drought-prone areas (Bundelkhand through Ken–Betwa; eastern Rajasthan through PKC–ERCP), flood moderation, hydropower, navigation.
  • Costs and concerns:
    1. Disputed “surplus” and state consent (Odisha on the Mahanadi; Chhattisgarh on the Indravati).
    2. Ecology: Panna Tiger Reserve, reduced flows to deltas, sediment loss.
    3. Displacement of tribal communities, especially in Fifth Schedule areas.
    4. Cost, delays and international agreements for the Himalayan component.
  • Chhattisgarh angle: upstream on both “surplus” basins; the Godavari–Cauvery link counts on Indravati water while Bastar’s own irrigation is low; the Mahanadi tribunal (2018) shows how contested upstream use already is.
  • Way forward: project-by-project appraisal, environmental flows, fair benefit-sharing with source states, and demand-side reforms (micro-irrigation, watershed works, tanks).
  • Conclusion: Inter-linking can be part of the answer, not the whole answer.

Quick Revision Table

FactDetail
Early ideasK.L. Rao Ganga–Cauvery link (1972); Dastur’s Garland Canal (1977)
NPPAugust 1980; Ministry of Irrigation + CWC
NWDA1982
Links30 = 16 Peninsular + 14 Himalayan
Status (July 2025)PFR 30, FR 26, DPR 11; only Ken–Betwa under implementation
Ken–BetwaMP–UP; Daudhan dam; ₹44,605 crore; 90:10; Cabinet Dec 2021; foundation 25 Dec 2024, Khajuraho
PKC–ERCPRajasthan–MP; MoU 28 Jan 2024; foundation Dec 2024
Godavari–CauveryInchampalli to Grand Anicut; about 148 TMC of Indravati (Chhattisgarh’s share) water
Mahanadi–GodavariManibhadra to Dowlaiswaram; Odisha disputes surplus
Article 262Water disputes; courts’ jurisdiction can be excluded
Water in the ConstitutionEntry 17 State List, subject to Entry 56 Union List
Mahanadi tribunal2018; Odisha vs Chhattisgarh

Key Takeaways

Key Takeaways
  1. NPP (1980) and NWDA (1982) identified 30 links (16 Peninsular, 14 Himalayan).
  2. Ken–Betwa is the first link under implementation (foundation stone 25 December 2024); PKC–ERCP followed with a 2024 MoU.
  3. The Peninsular plan relies on Mahanadi and Godavari “surplus”, which puts Chhattisgarh and Odisha at the centre of the debate.
  4. Water is a State subject, but Article 262 and the 1956 Act provide tribunals for inter-state rivers.
  5. Good Mains answers weigh benefits against ecology, displacement, cost and consent.

What’s Next